Up a level |
Yeong, W.C. and Khoo, M.B.C. and Lim, S.L. and Lee, M.H. (2017) A direct procedure for monitoring the coefficient of variation using a variable sample size scheme. Communications in Statistics - Simulation and Computation, 46 (6). pp. 4210-4225. ISSN 0361-0918, DOI https://doi.org/10.1080/03610918.2015.1109659.